IFA 2026: three days with the C4 and C5 in Berlin

Reading time1 minByBRAWN ROBOTICS
A visitor talking with the AGIBOT team next to a cleaning robot at the IFA 2026 booth

Three days into IFA 2026, and the AGIBOT · BRAWN ROBOTICS stand in Hall 25 has been busy with a very specific kind of conversation: not “what is this”, but “could it work in our building”.

At the stand

The C4 and the C5 stood at the centre of the stand, and visitors took the chance to see both ends of the cleaning line side by side — the compact machine for tight, divided spaces and the flagship for large floors. Seeing them in one place makes the difference between the two models much easier to judge than reading two spec sheets.

A wide view of the AGIBOT booth at IFA 2026 with visitors around the cleaning robots

The conversations

Facility teams, contractors and partners from several markets stopped by with the same practical questions: where does the docking station live in a building, how does a robot join a shift that already has a routine, and what does the first week of operation look like. This is exactly the stage where standing next to the machine helps most.

A cleaning robot demonstrated to visitors at the AGIBOT stand

Thanks, and after Berlin

Thank you to everyone who visited and shared their insights. If you are still at the show — through September 8 at Messe Berlin, Hall 25, H25-371 — come and say hello. And if Berlin is not on your route, our team is one message away.

Related products

Talk to us